To supply and install a phosphoric acid dosing system and bulk storage device. The system was installed into an existing pumping station in Eaton Cheshire and designed to dose phosphoric acid proportional to the flow in the water main . A new concrete chamber was built to house the flow meter and dosing points approx 5 meters by 5 meters and 4 meters deep . A new bulk storage tank was installed and double walled outlet pipework installed between the dosing rig and the tank. The system was designed so it could be operated remotely via a central control network.

mcvitties case study mcvitties case study Contact Us Tel: +44 (0)1606 837777

How We Helped

  • Substantial underground chamber and Civils work
  • Profibus based control panel with remote control facility
  • GRP bulk storage tank and access platforms
  • Ultrasonic level measurement

Valsave specialise in Water Treatment technology and MEI.

accreditations
© Copyright 2010 Valsave : All Rights Reserved | Website Design by Hunter Design

CONTACT US

Call: +44 (0) 1606 837777
Fax: +44 (0) 1606 837000
Email: sales@valsave.com

Valsave Twitter

WHERE WE ARE

Valsave Engineered Solutions
King Street Trading Estate
Middlewich, Cheshire
CW10 9LF
United Kingdom