United Utilities.

Current:  Secondary containment of pre and post chlorination pipework.

Current:  Replacement of gas scrubber base.

Current:  Maintenance of chemical transfer pumps.

Current:  Supply and installation of 24" flow control valve and PLC control panel on mains water.

Current:  Refurbishment of 2 penstock valves on 2 sites.

Current:  Chlorine dosing and triple validation.

Current:  Installation of colour monitor.

March:    Supply & installation of 30 m³ bulk tank and Kalic dosing rig.

May:        Supply and Installation of 5 off  water booster station controls.

July:       Installation of "air sweep system" on 2 off  lime silo tanks.

August:   Supply & installation of ammonia analyser, sampling and monitoring data loggers.

 

 

 

Products ] Systems ] Services ] Enquiry Form ] Site Map ] Feedback ] About VES ] Contact Information ]

Send mail to sales@valsave.com with questions or comments about this web site.
Copyright © 2001 Valsave Engineering Services Ltd
Last modified: September 12, 2001