System Project: Secondary Chlorination Customer: United Utilities Industry: Water Industry Description: The project consisted of the fabrication
and installation of twenty skid-mounted systems for secondary chlorination of
drinking water. The skids basically consisted of triple-validation
residual chlorine analysers; chloros dosing pumps; pipework; break tank;
sample and discharge lines; main control panel including Alan Bradley PLC and
enunciator etc. These were manufactured at our Middlewich workshop and
then transported to site and installed at Reservoirs throughout the Northwest
of England.
The
installation consisted of:
The Project involved the following disciplines:
|
|